Get a QuoteUpload your drawing

Prototyping

Low-Volume Aluminium Enclosure Production

Two routes to a first batch — machine with no die, or tool in 7–10 days with three free sample rounds and the tooling fee waived at 2 tonnes.

Most enclosure programmes do not start at five thousand pieces. They start with a drawing, a deadline and a budget that has no room for a die that might be wrong. There are two routes to a first batch and the choice is economic rather than technical: pay for tooling now, or pay per piece until the design stops moving.

Route A: no die, machine the first batch

The first units can be machined from solid bar or from a standard profile we already run. Nothing is cut in die steel, so the drawing can still change between the first and the tenth part — which is the normal state of a design before a connector or a PCB position is frozen. The trade-off is piece price: every feature costs cutting time instead of being formed by the die, so the unit cost is higher and does not fall with volume in the same way.

This route also suits programmes where the annual volume never justifies a die: one-off fixtures, test rigs, evaluation units, a handful of demo housings for a trade show.

Route B: open the die

A new die is developed in 7–10 days for solid and semi-hollow sections, and 15–20 days for complex hollow sections with a mandrel. The tooling fee is charged once and waived at 2 tonnes of cumulative order. Three rounds of free sampling are included, so a wall thickness or fillet correction after the first article does not restart the schedule or add cost. Mass production can start within 24 hours of sample approval.

StageDurationCost
DFM review of the 3D cross-section1 working dayFree
Tooling designIncluded in the toolingFree
New die development7–10 days (15–20 for complex hollow)Tooling fee, waived at 2 t
First samples7 daysFree, three rounds
Production start after approval24 hours—
Mass production25–30 daysPer quotation
Die modification, if needed3–5 daysPer quotation
Shipping4–7 days by air expressPer quotation

Which route is cheaper depends on the section, not on habit

QuestionPoints to Route A (machine first)Points to Route B (open the die)
Is the design frozen?PCB, connector or lid still movingSection signed off, changes are cosmetic
Annual volumeDozens, or a one-off programmeHundreds to thousands per year
Wall thicknessThick walls, simple outline0.3 mm walls, fine fins, internal ribs
ShapeA box that can be cut from barA section only a die can form
Time to first partNo die lead time7–10 days of tooling before the first sample

The break-even is not a fixed number of pieces. It depends on how much metal the die pushes and how long the press run has to be, so we work the minimum out per project from the cross-section and quote it with the tooling cost. You see both numbers before committing.

Minimum order, stated honestly

There is no single blanket MOQ. Typical overseas programmes run in bands of 500, 1,000 and 5,000 pieces, but we quote a made-to-order minimum rather than refuse a job that sits below the band. A small 20 × 20 mm heat-sink section and a 150 mm console housing have very different break-even points, and quoting one number for both would be a fiction.

What a trial order actually looks like

  • Day 1. Drawing and section review, with a DFM mark-up returned on the cross-section. Free, and before any tooling commitment.
  • Day 1–10. Die design and development. You approve the section drawing before die steel is cut.
  • Day 10–17. Die trial and first samples, shipped for fit and function checks.
  • Sample rounds 2 and 3. Free, if the first article needs a wall, fillet or groove correction.
  • After approval. Production starts within 24 hours; the batch runs in 25–30 days depending on volume and finish.

Holding stock so the trial does not become a supply gap

Once a profile is running, extruded length can be held at our 3,000 m² warehouse and released to machining in batches on call. For a programme ramping from a trial order into regular shipments, that removes most of the ocean-freight uncertainty: the long-lead item is already made, and the machined batch is released against your schedule.

Questions buyers ask

Can I get sample parts before committing to tooling?

Yes. Small quantities can be machined from solid bar or a standard profile with no die at all, which is the usual route while the design is still moving. Once the section is frozen, the die route includes three rounds of free samples.

What is the smallest order you will run?

There is no fixed piece count. We work the minimum out per project from the cross-section and quote it with the tooling cost; typical bands are 500, 1,000 and 5,000 pieces, and orders from 2 tonnes have the tooling fee waived.

How long from drawing to first sample?

About 17 days on the die route: 1 working day for DFM, 7–10 days for the die, then 7 days for samples. Complex hollow sections add roughly another week of die development. The machining route skips the die lead time entirely.

Is the tooling fee refundable?

It is charged once and waived once cumulative orders reach 2 tonnes. The die remains your tooling under NDA, and its drawings and correction history stay inside one company.

Send the drawing and the volume you expect in year one — we will tell you whether tooling pays back, and quote both routes.