Extrusion decides the cost of an aluminium enclosure before a single chip is cut. The die fixes the section, so a profile designed around the press — rather than around a machining strategy — takes metal, time and tolerance stack out of everything downstream. We design the die, run the extrusion, machine the ends and finish the part in one plant in Shenzhen: a 700 t R700 and an 1,800 t R1800 press, up to 220 mm circumscribing circle and 6 m billet length.
What the extrusion process constrains before you draw
Most of the cost of a custom enclosure is locked in at the section drawing. These are the limits we argue about at review stage, because fixing them afterwards means a new die:
- Wall thickness. 0.3 mm is what we hold in stable mass production. Thinner is possible on paper and unreliable at the press, so we say no rather than quote a number the die cannot repeat.
- Hollow sections. A hollow needs a porthole or bridge die with a mandrel, which is a different die build and a longer lead time — 15–20 days instead of 7–10.
- Envelope. 220 mm circumscribing circle is the hard ceiling per press, and the shape has to sit inside it, not just the bounding box.
- Fins and ribs. Aspect ratio above roughly 15:1 and the die lips deflect in volume, so heat-sink fins start waving and the section stops being repeatable.
- As-extruded tolerance is not machining tolerance. Linear accuracy runs per metre and depends on the section, which is why critical faces are machined afterwards rather than trusted from the press.
How we hold the numbers
The difference between a clean anodised part and one that needs hours of polishing is the billet. We run primary 6063 billet from a state-owned mill through ceramic filtration, on-line degassing and homogenising, so the profile has no sand holes and no weld lines. That lets it go straight to 180# blasting and anodising with no polishing stage — typically about 15% less finishing cost than a profile that has to be polished first.
Both presses run with in-process checks on wall thickness and section, and cut lengths are faced on the CNC afterwards rather than trusted to the saw. That is the difference between ±0.2 mm from a saw and ±0.02 mm on a machined end face.
Extrusion capability
| Parameter | Capability | Note |
|---|---|---|
| Press capacity | 700 t (R700) + 1,800 t (R1800) | Two automated lines |
| Circumscribing circle | Up to 220 mm | Per press, per section |
| Maximum profile length | 6 m | Longer parts are joined, not extruded |
| Stable wall thickness | 0.3 mm | Mass-production stable |
| Inner / outer diameter | ±0.04 mm | GB standard is ±0.10 mm |
| Wall thickness | ±0.02 mm | GB standard is ±0.05 mm |
| CNC end-face cut length | ±0.02 mm | Saw cut alone is ±0.2 mm |
| High-precision option | ±0.005 mm | Lapped to ±0.002 mm on request |
| Default alloy | 6063-T5 | 6061-T6 for structural parts |
| New die lead time | 7–10 days | 15–20 days for complex hollow sections |
| Sample | About 7 days | After die trial |
| Mass production | 25–30 days | After sample approval |
Die design and tooling, step by step
Tooling is not a black box with a price attached. Each stage below has a named output you can review, which is how a section that looks impossible on a 2D sketch becomes a die that runs for years.
| Step | What happens | Time |
|---|---|---|
| 1. Feasibility review | We read your drawing against the press: section, alloy, wall, tolerance, finish. Free, and answered within one working day. | 1–2 days |
| 2. Die design | Bearing length, porthole or bridge layout, mandrel support, thermal balance of the section. | 2–3 days |
| 3. Die manufacture | Die steel cut, heat treated and nitrided, then trial-pressed. | 7–10 days |
| 4. Trial and sample | First-off parts measured, section checked, sample sent for your approval. | About 7 days |
| 5. Mass production | Extrusion, machining, finishing and assembly scheduled against your PO. | 25–30 days |
| Die modification | Bearing or mandrel change after trial, if the section needs it. | 3–5 days |
Section types we run
- Solid sections — mounting plates, base plates, simple housings, slide rails.
- Semi-hollow — enclosures with a partial cavity, cable channels, weatherproof lips.
- Hollow (porthole / bridge die) — full box sections, sealed bodies, tube-in-tube designs.
- Finned heat-sink sections — 0.3–1.2 mm fins, up to about 60 mm high, aspect ratio up to 15:1.
- Multi-cavity and paired sections — two mating halves in one die where the volume justifies it.
Choosing the alloy
| 6063-T5 | 6061-T6 | |
|---|---|---|
| Role | Default for enclosures | Structural or load-bearing parts |
| Extrudability | Excellent — fine detail, sharp corners | Harder — heavier walls, less detail |
| Surface after anodising | Even, polish-free route available | Slightly harder to match across batches |
| Strength | Adequate for housings and heat sinks | Higher, for machined load paths |
| Thermal conductivity | About 209 W/m·K | Lower than 6063 |
If a drawing specifies 6061-T6 but the part carries no structural load, we will say so — the section usually has to grow, and the customer pays for strength that the application does not use.
What happens after the press
Extrusion on its own rarely ships. Ends are faced and cut to length, holes and threads are added, and the part is anodised or coated — see CNC machining on extruded profiles and surface finishing. Because all of it happens under one roof, the datum does not change hands between suppliers, and there is no freight leg between the press and the machine.
Questions buyers ask at this stage
Can you design the die from a 2D sketch?
Yes, and it is normal. Send the section with the features that matter — overall envelope, wall, where the PCB sits, where the screws go — and the die designer will propose the rest. You approve a section drawing before any die steel is cut.
What is the smallest order for a custom section?
Typical volumes are 500, 1,000 and 5,000 pieces, and the tooling cost amortises differently at each. There is no fixed piece count: below the typical band we quote honestly on a made-to-order basis rather than refuse the job.
How long does a new die take?
7–10 days for a solid or semi-hollow section, 15–20 days for a complex hollow with a mandrel. Add about 7 days for the sample after the die trial.
Do you extrude and machine in the same plant?
Yes — tooling, extrusion, CNC machining, surface treatment and assembly are all in-house in Shenzhen. Nothing critical leaves the building, which is also why we can hold ±0.02 mm on a wall and ±0.04 mm on a diameter in the same part.
Send the section drawing and the annual volume — you will get a feasibility opinion, a die price and a piece price within one working day.