Short answer: extrusion puts a large fixed cost into a die and then charges very little per unit; machining charges nothing up front and a lot per part. Below roughly 500 units the die rarely pays back. Above 1,000 units extrusion almost always wins — unless too much of the geometry still has to be machined afterwards.
Two cost curves, one crossover
Model both routes as straight lines and the decision stops being a matter of opinion:
- Machining: total = units × (billet + spindle time + finishing). No constant term, so the line starts near zero and climbs steeply.
- Extrusion: total = die + units × (billet + press time + cut + secondary machining + finishing). A large constant, then a shallow slope.
The crossover is where the lines meet: break-even units = die cost ÷ (machined unit cost − extruded unit cost). Put your own two quotations into that expression and you have the answer for your part — which is why we quote the same drawing both ways rather than argue the general case.
Where the money goes
| Cost element | Extrusion | CNC machining |
|---|---|---|
| Tooling | One die per section, scaled to the circumscribing circle | Fixtures and soft jaws only |
| Material | Billet converted almost entirely into product | A large share leaves as chips; the scrap is recycled, but the block is still bought |
| Machine time | Press time measured in seconds per metre | Spindle time measured in minutes to hours per part |
| Secondary operations | Drilling, tapping and face milling on the cut blank | Already inside the machining cycle |
| Finishing | Anodising or powder coating, priced per part | Same |
| How it scales | Almost flat per unit once the die exists | Almost linear with units |
Where the crossover actually sits
Three things move it, and all three are visible on a drawing:
- Part size. A large enclosure machined from solid burns hours of spindle time and most of a billet. That pushes the crossover down — sometimes to a couple of hundred pieces.
- Die re-use. If one profile serves a family of products, the die amortises across several SKUs, and extrusion wins at volumes that would otherwise stay marginal.
- How much still has to be machined. A profile that needs six faces milled afterwards is barely cheaper than a solid part. Move the features into the die and the slope flattens.
Die cutting runs 7–10 days here, and the fee is waived on orders of 2 tonnes or more — worth putting next to both quotations before you decide.
Five design decisions that move the number
- Keep the section constant as far as possible. Every feature that varies along the length becomes a machined operation on every unit.
- Keep walls at or above 1 mm on compact sections. Below that, die cost and scrap rate rise faster than the material saving.
- Put tolerance where the function is. Extrusion follows EN 755 profile tolerances; machining holds ±0.04 mm routinely and ±0.02 mm on wall thickness when asked. Machining tolerance on an as-extruded face buys nothing.
- Choose the alloy for the process. 6063 extrudes cleanly and takes a deep anodic film; 6061-T6 machines better and is the right call when strength or heavier walls matter.
- Batch the secondary operations. One setup across the whole run beats machining part by part.
When machining stays cheaper even at volume
- The geometry cannot be extruded at all — tapered, twisted, or fully three-dimensional.
- Annual volume is genuinely small and forecast to stay small.
- The part is large and simple but needed in tens, not thousands.
- The design is still moving: a die cut against a changing drawing is money spent twice.
FAQ
Is extrusion always cheaper at high volume?
No. If several faces still need machining after extrusion, the per-unit saving narrows and a machined part can stay competitive well past 1,000 units. Extrusion wins when most of the geometry lives in the die.
What does the die cost depend on?
Mainly the size and complexity of the cross-section — a large section needing a 1,800 t press and a multi-port die is a different investment from a small thin-walled profile off the 700 t press. Both are quoted against your drawing, not from a price list.
Does the 2-tonne tooling waiver apply to repeat orders?
It applies to the order that reaches the threshold, and the die stays yours for subsequent runs, so the second order carries no tooling at all.
Can you quote both routes on one drawing?
Yes — machining, extrusion, and the hybrid build, on the same page, with the features driving each cost flagged.
Get both numbers before you commit
Send the drawing and your annual volume and we will return a costed comparison of all three routes with DFM feedback, so the programme starts on the right side of the break-even curve.