Short answer: if the housing keeps one constant cross-section along its length and you will build more than a few hundred units, extrude the body and machine only the features that need precision. If the geometry changes on every face, or the design is still moving, machine it from solid. Almost every production enclosure ends up as a hybrid of the two.
What each process actually does
Aluminium extrusion pushes a heated billet through a steel die, producing a profile whose cross-section never changes; the profile is then cut to length. Anything that repeats along that length — screw bosses, card guides, heat-sink fins, sealing grooves, PCB slots — can be built into the die and costs almost nothing per unit afterwards.
CNC machining starts from a solid billet or plate and removes material with a rotating cutter. No die fixes the geometry, so features can vary in all three axes, but every unit carries the machine time and the metal that leaves as chips.
Four questions that decide the process
Work through these in order. The first clear "no" usually settles the choice.
- Does the cross-section stay constant along the length? If yes, extrusion is available to you. If the profile has to twist, taper, or change section, only machining or a welded assembly will produce it.
- Is annual volume past roughly 500–1,000 units? Below that the die has too few parts to amortise. Above it, extrusion's unit-cost advantage compounds quickly.
- Do you need walls thinner than about 1 mm? Extrusion holds walls down to 0.3 mm as a matter of course. Milling a 0.3 mm wall is slow, chatter-prone, and often scrapped.
- Are the tight tolerances on features that can be machined after extrusion? If the critical fits sit on end faces, connector cut-outs, or bores, extrude the body and machine those faces afterwards — ±0.04 mm where it matters, without paying for it everywhere.
Side-by-side comparison
| Factor | Extrusion | CNC machining |
|---|---|---|
| Geometry | Constant cross-section only | Free-form, varies on every axis |
| Tooling | One die per profile, 7–10 days to cut | Fixtures only, no part-specific tooling |
| First article | After the die is proven and sampled | Days from a STEP file |
| Wall thickness | Down to 0.3 mm | Practical floor around 0.8–1 mm |
| Typical tolerance | EN 755 profile tolerances, refined by post-machining | ±0.04 mm routine, ±0.02 mm on request |
| Cost behaviour | High once, low per metre | Low once, near-linear with volume |
| Best volume band | Hundreds to hundreds of thousands | Prototypes to a few hundred |
| Finish | Anodises evenly along the full length | Anodises evenly; machined faces read finer |
When extrusion is the right call
- Housings with a repeating section: DIN-rail cases, card cages, LED tube bodies, linear fixtures, handheld shells with a flat battery bay.
- Profiles that carry their own function — PCB slots, card guides, screw channels, heat-sink fins. Each of these is free once it lives in the die.
- Long parts: one 6 m profile replaces several joined and sealed sections, which removes leak paths as well as cost.
- Programmes where one profile serves a product family, so a single die amortises across several SKUs.
Our two presses cover the range: an 1,800 t R1800 for large sections up to a 220 mm circumscribing circle, and a 700 t R700 for smaller, thinner-walled profiles. Maximum profile weight is 4 kg/m, cut to 6 m lengths before machining.
When CNC is the right call
- Prototypes and design iterations — no tooling means yesterday's drawing can be cut today.
- Shapes that change along the length: angled faces, tapered bodies, organic curves, pockets on several planes.
- Runs under a few hundred units, where a die would never amortise.
- Tolerances held across multiple datum faces, or bores and threads that must stay true to each other.
Thirty CNC centres — 5 five-axis, 10 four-axis, 15 3+2 — cover both solid-stock machining and second operations on extruded blanks.
The hybrid route is the normal answer
Nearly every production enclosure we ship uses both processes at once: the body is extruded, then end plates, connector cut-outs, display windows, threaded inserts and sealing faces are machined — before anodising where the cut edges need a film, after it where the mating face must stay conductive.
This is not a compromise, it is where the economics come from. Extrusion absorbs the large, repetitive, thin-walled geometry at near-zero marginal cost, and machining is spent only on the small areas where a tolerance actually does something.
Three mistakes that cost real money
- Writing machining tolerances onto an as-extruded face. A profile cannot hold ±0.04 mm on its outside section without post-machining. Specifying it anyway either raises the price or ships parts that fail inspection.
- Designing features that vary along the length. Every machined pocket that could have been a continuous slot in the die adds spindle time to every unit for the life of the programme.
- Cutting tooling before the design is frozen. A die made against an unvalidated design is money spent twice.
FAQ
Can I get an extruded enclosure without paying for a die?
Not the first time — the die is specific to that cross-section. What we do instead is machine the prototype from solid bar so you validate fit and finish with no tooling spend, then cut the die once the design is frozen. On orders of 2 tonnes or more the die fee is waived.
Which process is cheaper at 500 units?
At 500 units machining usually still wins on total cost, because the die has too few parts to amortise. The crossover normally sits between 500 and 1,000 pieces, and moves down as the part grows larger and more of its geometry can live in the die.
How long does a new extrusion die take?
7–10 days to cut a new profile die, on top of sampling and approval. A machined first article comes off the machine in days instead.
Can extrusion really hold a 0.3 mm wall?
Yes, and that is one of its strongest arguments — thin walls are where extrusion is not merely cheaper but the only feasible route.