Get a QuoteUpload your drawing

Industrial & Emerging

Handheld Device & LED Tube Housing — Custom Aluminium Enclosure

Fast-turn bodies for handheld fans, LED tubes and emerging devices — new die in 7–10 days, samples in 7 days.

Aluminium housing for handheld fan and LED tube devices

Fast-turn bodies for handheld fans, LED tubes and emerging devices — new die in 7–10 days, samples in 7 days.

Specifications

ItemSpecification
Size rangeTo your drawing
Alloy6063-T5
Typical tolerance±0.04 mm
Wall thicknessTo your drawing
Surface finishAnodising
EMI / IP ratingTo customer requirement
ToolingNew die in 7–10 days
Samples7 days
Mass production25–30 days, or as agreed in the quotation
Typical MOQ500 pcs (no fixed piece count — the minimum follows your cross-section and extrusion batch)

How we make it

  1. Send your drawing — STEP, IGES, SolidWorks, DWG or a dimensioned PDF. NDA available first.
  2. Free DFM review — engineers check section feasibility and suggest improvements within one working day.
  3. Tooling & samples — new die in 7–10 days, samples in 7 days, three rounds free.
  4. Extrusion & CNC — both presses and 30 CNC centres run in the same plant, so profile stock never leaves the building.
  5. Anodising & finishing — 100% in-house, including colour matching and masking of threads and sealing faces.
  6. Approve & produce — mass production lead time is 25–30 days, or as agreed in the quotation.
  7. Pack & ship — pearl cotton plus wooden crates, FOB Shenzhen / Hong Kong, CIF or DDP.

Related reading

Tooling and sample lead time · LED lighting aluminium housings · How MOQ is calculated

← All 12 aluminium enclosure product lines

Send your drawing for a quote

MOQ, tooling cost and lead time are worked out per project from your cross-section — you see all three numbers before committing. Samples in 7 days, mass production in 25–30 days, or as agreed in the quotation.