Yes — the profile is extruded and machined in the same plant. That removes material lead time (usually the longest line item in an enclosure programme) and keeps the extrusion datum identical to the machined datum.
Three things go wrong when extrusion and machining sit in different factories. Lead time: waiting for stock from a third-party press adds weeks, while we move from tooling to machined samples in 7 days. Temper: we control the age-hardening condition of the stock, so machinability and final strength are predictable. Datum: the press and the CNC centre reference the same section geometry, which is why ±0.04 mm holds in volume rather than only on a first article.
There is a cost effect too. Because we design the die, we extrude near-net shape and leave machining to remove only what is necessary — less cycle time, less scrap, lower piece price.